Lifecycle costing

As mentioned above,target costing places great emphasis on controlling costs by good product design and production planning,but those up‑front activities also cause costs.There might be other costs incurred after a product is sold such as warranty costs and plant decommissioning.When seeking to make a profit on a product it is essential that the total revenue arising from the product exceeds total costs,whether these costs are incurred before,during or after the product is produced.This is the concept of life cycle costing,and it is important to realise that target costs can be driven down by attacking any of the costs that relate to any part of a product’s life.The cost phases of a product can be identified as:

original (15).gif

There are four principal lessons to be learned from lifecycle costing:

All costs should be taken into account when working out the cost of a unit and its profitability.

Attention to all costs will help to reduce the cost per unit and will help an organisation achieve its target cost.

Many costs will be linked.For example,more attention to design can reduce manufacturing and warranty costs.More attention to training can machine maintenance costs.More attention to waste disposal during manufacturing can reduce end-of life costs.

Costs are committed and incurred at very different times.A committed cost is a cost that will be incurred in the future because of decisions that have already been made.Costs are incurred only when a resource is used.

Typically,the following pattern of costs committed and costs incurred is observed:

original (16).gif

The diagram shows that by the end of the design phase approximately 80%of costs are committed.For example,the design will largely dictate material,labour and machine costs.The company can try to haggle with suppliers over the cost of components but if,for example,the design specifies 10 units of a certain component,negotiating with suppliers is likely to have only a small overall effect on costs.A bigger cost decrease would be obtained if the design had specified only eight units of the component.The design phase locks the company in to most future costs and it this phase which gives the company its greatest opportunities to reduce those costs.

Conventional costing records costs only as they are incurred,but recording those costs is different to controlling those costs and performance management depends on cost control,not cost measurement.

ACCA PM知识点:Target costing

2022年ACCA最新学习资料包

请大家认真填写以下信息,获取2025年ACCA学习资料包,会以网盘链接的形式给到大家,点击免费领取后请尽快保存。

*姓名不能为空

*手机号错误

获取验证码

*验证码错误

Gloria

Gloria

讲师认证:多年银行从业,销售业绩总行上榜,丰富的银行相关培训经验,及移民留学服务经验,精通法语及日语

CFA持证人,FRM持证人,精通法语及日语,十年银行工作经验及移民留学服务经验,从事金融证书行业培训4年有余,个性温柔,授课活泼、思路清晰,善于搭建知识框架思维导图,阐述知识要点,结合有关案例,帮助学员理解并掌握重点知识,能从学员的角度出发,进行通俗易懂的讲解,并耐心回答学员问题,同时培养他们思考问题的能力。以成功带出数十位优秀学员。

免费下载老师推荐的学习资料

免费直播

当财会邂逅“智能”,是颠覆还是赋能

06-15 19:00-06-15 20:30

直播结束

【牛人俱乐部】财经大学生没有退路才有出路

03-11 19:00-03-11 20:30

观看回放

【牛人俱乐部】60分钟拯救大学生焦虑症

03-09 19:00-03-09 20:30

观看回放
注册有礼
在线咨询
学员服务
免费通话
申领资料
在线咨询
+
中博教育·免费咨询
输入您的手机号,点击“免费通话”,将接到中博咨询老师的电话,请放心接听,该电话完全免费
信息保护中请放心填写

获取2025年学习资料包

了解更多我们的课程,填写信息得学习资料包
姓名
联系电话
联系邮箱
您想获取的资料